⚡ Spokane EV Charging Contact Us

Terms of Service

Effective Date: October 20, 2026

1. Agreement to Terms

By using this website or engaging Spokane EV Charging Specialists (WA Lic #EC-SPOKEV*821JA), you agree to be bound by these Terms of Service and applicable Washington State laws governing electrical contractors.

2. Licensed Electrical Scope of Work

All electrical contracting services, Level 2 EVSE installations, 200A service panel upgrades, and trenching are performed in compliance with the National Electrical Code (NEC Article 625), Washington Administrative Code (WAC 296-46B), and local municipal jurisdictions.

3. Permitting and Inspection Responsibilities

Electrical permits are required by law for all EV charger installations. Spokane EV Charging Specialists obtains all necessary permits from the City of Spokane, City of Spokane Valley, or WA L&I. Work is guaranteed to pass final green-tag electrical inspection.

4. Warranty Coverage

We provide a turnkey 3-year warranty covering all contractor-supplied breakers, electrical conduits, copper wiring, and installation labor. Customer-supplied charging hardware (such as Tesla Wall Connectors or ChargePoint units) is warranted under the manufacturer's warranty.

5. Utility Rebates (Avista Schedule 77)

We assist homeowners in submitting necessary documentation for Avista Utilities electric vehicle incentives. However, rebate eligibility, funding availability, and final rebate disbursements are determined solely by Avista Utilities.

6. Governing Law

These terms are governed by the laws of the State of Washington. Any legal proceedings shall be held within Spokane County, Washington.